Master Section
Module Guide: Master Section
Module Location
Settings > Production > Master Section
Module Purpose
The Master Section module is used to define work areas or functional stages on the production floor. Each "section" represents a center of activity where a group of specific production operations or activities are carried out. This module plays a key role in grouping production activities, which later becomes the basis for creating Routing (process flow) and defining Work Centers.
1. Main View (Section List)
The main page displays a list of all production sections registered in the system.
View Explanation
-
Filter: Allows a quick search for a specific section by Section Code.
-
Section List Table:
-
Section Code: A unique code for each section (e.g.,
BPRO,WPRO,CPRO). -
Section Name: A descriptive name for the area or function (e.g.,
Biscuit Production,Wafer Production). -
Section Activities: Displays the list of production activities conducted within the section.
-
-
Action Buttons:
-
Add Section: Opens the form to create a new section.
-
Delete Section: Deletes the selected section.
-
2. Add Section Page
This form is used to define a new section and allocate which activities belong to it.
View Explanation
-
Code, Name, & Description: Fields to define the section’s identity and explanation.
-
Activities: This is the core feature of the module. There are two list boxes:
-
Left Box: Displays all available activities from the Activity Master.
-
Right Box: Displays the activities that have been selected to be part of the section being created.
-
-
Buttons
>>and<<: Used to move activities from the available list to the allocated list, and vice versa. -
Action Buttons: Save to store the data and Cancel to go back.
3. Steps to Create a New Section
-
Ensure all relevant production activities have been created first in the Activity Master module.
-
From the main page, click the Add Section button.
-
Fill in the Section Code, Section Name, and Description.
-
In the Activities area, select one or more activities from the left box.
-
Click the
>>button to move the selected activities to the right box. -
Click Save.
4. Integrated Workflow & Business Process
-
Building Work Centers: A section is a key component in defining a Work Center. A Work Center is a combination of a Section (where tasks are performed), Machines (Machine Master), and Labor (Workgroup Master).
-
Basis for Routing: A Routing, or production process flow, is a sequence of various activities. With sections, the routing becomes more specific. For example:
-
The routing for a "Chocolate Wafer" product could be: Formulation Activity (in the Formulation Section) -> Wafer Activity (in the Wafer Production Section) -> Packing Activity (in the Packing Section).
-
-
Production Planning and Scheduling: When the system schedules a Work Order, it will allocate resources (machines and labor) located in the precise section according to the order of activities in the Routing.
-
Cost Accounting: Overhead costs can be accumulated per section. By knowing what activities are performed in a section, costs incurred in that section (like electricity, rent, etc.) can be more accurately allocated to the products passing through it.
5. Tips & Important Notes
-
The section structure should reflect the physical layout or logical process flow on your production floor.
-
This module heavily depends on the Activity Master. Make sure the activity master is complete before defining sections.
-
Management of this module should ideally be handled by the PPIC (Production Planning and Inventory Control) team or Industrial Engineering, who are responsible for designing and optimizing production processes.