### **Module Guide: Master Activity (Production Activities)**

#### **Module Location**

#### Production &gt; Settings &gt; Master Activity

#### **Module Objective**

#### The **Master Activity** module serves as the master data hub for defining all standard activities, stages, or sections within the production process. Each activity created here (e.g., "Formulation Activity", "Baking Activity") will become a reusable building block when defining the production process flow (routing) for each product.

### **1. Main View (Activity List)**

#### The main page of this module displays a list of all standard production activities that have been defined.

#### **View Explanation**

- #### **View**: This page is a list of all existing activities. You can see the **Activity Name,** standard **Duration,** and a brief **Description**.
- #### **Action Buttons**:
    
    
    - #### **\[Add\]**: The primary button to create a new standard activity.

### **2. Steps to Add a New Activity**

#### **Step 1: Create a New Activity**

#### From the Main View, click the **\[Add\]** button to open the **Add Activity** form.

#### **Step 2: Fill in Activity Details**

#### On the form that appears, fill in the basic activity information:

- #### **Activity Name**: Enter a clear name for the process stage (e.g., Mixing, Baking, Cooling, Packaging).
- #### **Duration**: Enter the estimated standard duration required to complete this activity.
- #### **Description**: Provide additional explanation regarding the activity.

#### **Step 3: Save**

#### After all data is filled in, click the **\[Save\]** button to save the new activity.

#### **Workflow &amp; Integrated Business Process**

- #### This module is a preparatory step before you can create a detailed production process flow.
- #### The activities you define here will become the options when you build the **Production Routing** or workflow in another module, which will determine the sequence of steps for making a product.

### **Tips &amp; Important Notes**

- #### Ensure the standard **Duration** is filled in as accurately as possible, as it will become the basis for production scheduling and capacity calculations.
- #### This is a fundamental master data module that should be set up by the **Industrial Engineering or PPIC** team.